Hello everyone,


I have problems visualizing the movement of the flaps control rods at this stage of the construction, and so I’m not sure how to finish the wiring of the two headers, and positioning of the harness to avoid any friction.


On the right, I positioned the ELT remote ctrl, but looking at the flap rod, I wonder if I made a mistake…


Do you have pictures of your wiring installations in both headers so I can see what solutions you have adopted?


Thanks in advance!
Yves

IMG_7846.jpg

IMG_7845.jpg