-
Wing Rivet installation on LE topside
There is an instruction to delay installation of some topside LE wing rivets on Page 144 of the EX2 Wing Manual
"Do not install the first rivet in the #1, #3 and #5 rib at this time." (Page144)
When do these remaining HDW-SS/SS42D rivets get installed?
There is instructions about remaining rivets on Pages 150 and 152, are these related to the above?
There appears to be no reason to delay beyond the fabric covering stage.
Tags for this Thread
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules