Got my Airworthiness Inspection last week and as soon as I get the fuel tank covers on, it's time for the first lap around the pattern.
Can't thank Mitch enough for all his help and CC for an unbelievable plane/kit. The tolerances and precision for which CubCrafters designed and produced are outstanding. It took about 7-1/2 months (not counting vacations and hunting trips) and about 730 total hours of build time (excluding manual pre-reading/video watching, etc.)
Thanks to everyone on the forum for all their help (especially Chuck and Troy who were always willing to share and help)
IMG_7805.jpg