I am in the process of installing my G3X panel and was wondering if anyone can explain the operation of the IBBS switch for me. From my understanding, it is back up power for the G3X. I think the switch should be on any time the master is on? If the power is drawn down the IBBS will pick up the load until the load stabilizes such as during start. Am I missing any thing else it will do?
MR