Originally Posted by
randylervold
Update: 12/2/2013
One of our outside DERs will be back on site tomorrow for the final round of flight testing. This testing will be to hopefully validate our preferred retrofit design. If the data from all the flight modes comes back positive we will immediately begin manufacturing parts in quantity. It might be possible to provide a shipping estimate at that time. If there are any stress issues remaining unfortunately we'll need to adjust the design and re-test.
We should have a decision on whether we'll be moving on to manufacturing by Thursday or Friday, I'll post an update at that time.